It's been about a month since the renovation works started. This is update no. 4. I did weekly updates, so it's been 4 weeks.
The master bedroom bathroom. Tiles and the grooves for the glass partition are done.

Common bathroom tiles and grooves. Before the piping was concealed.

After the piping was concealed. Much better looking, but of course, the bathroom would be smaller. However, it need not look much smaller. The tiles we chose were long and larger than the previous ones, and the colour scheme will make the bathroom look bigger than it is.

And they patched up the wall to the study room from the living room. In anticipation of the glass to be fitted in.

Next week, the 5th week will move faster since fixtures will come in and the kitchen cabinetry will be in. Hopefully we can get the apt back in the 6th week! Yay!